All clients are advised to talk to a Client Service Unit (CSU) staff to determine availability of product, documentary requirements, required fee, delivery options, payment options, and processing time. Processing time will only commence after the External Client Request (ECR) form is accomplished by the CSU staff.

Options for OFF-SITE CASH PAYMENT allow clients to pay the required fees through the Land Bank of the Philippines (LBP), or as per instruction of the CSU Staff. Clients must secure Proof of Payment (POP). Verification of POP may take 2 days.

PRODUCTS, PROCESSING TIME (PT) & FEE
PRODUCTS UNIT PT FEE
Certification of Offshore Activity (COA) certificate 15d 1h 15m 2,500.00
Certification of Geodetic Control Points certificate 30m 360.00
Certification of Municipal Water Map and Technical Description certificate 2h 30m 5,000.00
+ per km 2h 30m 50.00
Certification of Nautical Distances (CND) 1st 25 M 2h 30m 180.00
+ per M 2h 30m 25.00
Certification of No Record of LC map and/or FAO certificate 7d 100.00
Certification of Oceanographic Information (COI)
raw hourly heights data per month station 15d 1h 15m 360.00
processed hourly heights data per month station 15d 1h 15m 360.00
times and heights of high and low waters including lunitidal interval of daily heights per month station 15d 1h 15m 360.00
monthly and annual data of mean sea level and other tidal datum planes per month station 15d 1h 15m 360.00
tide reducers per month station 15d 1h 15m 150.00
annual mean sea level monthly means station 15d 1h 15m 360.00
highest and lowest tide observed station 15d 1h 15m 360.00
tidal extremes per yeary station 15d 1h 15m 360.00
tidal data processing and analysis per month station 15d 1h 15m 1,000.00
advance copy of tide prediction per month station 15d 1h 15m 360.00
processed serial cast conductivity, temperature, epth/expendable bathythermograph (sound velocity, temperature, salinity, conductivity, pressure) per inshore or offshore oceanographic station per cast (3 parameters of less) 15d 1h 15m 400.00
processed serial cast conductivity, temperature, epth/expendable bathythermograph (sound velocity, temperature, salinity, conductivity, pressure) per inshore or offshore oceanographic station per cast (4 or more parameters) 15d 1h 15m 600.00
Certification of Slope Map (printed, 100 sq.m. and below) certificate 19d 9,545.00
9,545.00 + 10.00 /sq.m. in excess of 100 sq.m. to 200 sq.m. sq.m. 15d 1h 15m + 10.00
10,535.00 + 9.00 /sq.m. in excess of 200 sq.m. to 300 sq.m. sq.m. 15d 1h 15m + 9.00
11,426.00 + 8.00 /sq.m. in excess of 300 sq.m. to 400 sq.m. sq.m. 15d 1h 15m + 8.00
12,218.00 + 7.00 /sq.m. in excess of 400 sq.m. to 500 sq.m. sq.m. 15d 1h 15m + 7.00
12,545.00 + 5.00 /sq.m. in excess of 500 sq.m. to 1,000 sq.m. sq.m. 15d 1h 15m + 5.00
15.045.00 + 2.50 /sq.m. in excess of 1,000 sq.m. to 5,000 sq.m. sq.m. 15d 1h 15m + 2.50
25.045.00 + 1.50 /sq.m. in excess of .5 ha. to 1 ha. sq.m. 15d 1h 15m + 1.50
32,545.00 + 0.75 /sq.m. in excess of 1 ha. to 2 has. sq.m. 15d 1h 15m + 0.75
40,045.00 + 0.50 /sq.m. in excess of 2 has. to 5 has. sq.m. 15d 1h 15m + 0.50
55,045.00 + 0.20 /sq.m. in excess of 5 has. to 10 has. sq.m. 15d 1h 15m + 0.20
65,045.00 + 1,500.00 /ha in excess of 10 has. to 20 has. ha. 15d 1h 15m + 1,500.00
92,545.00 + 1,000.00 /ha in excess of 30 has. to 50 has. ha. 15d 1h 15m + 1,000.00
112,545.00 + 800.00 /ha in excess of 50 has. to 100 has. ha. 15d 1h 15m + 800.00
152,545.00 + 600.00 /ha in excess of 100 has. to 200 has. ha. 15d 1h 15m + 600.00
212,545.00 + 400.00 /ha in excess of 200 has. to 500 has. ha. 15d 1h 15m + 400.00
332,545.00 + 200.00 /ha in excess of 1,000 has. ha. 15d 1h 15m + 100.00
432,545.00 + 100.00 /ha in excess of 500 has. to 1,000 has. ha. 15d 1h 15m + 200.00
77,545.00 + 1,250.00 /ha in excess of 20 has. to 30 has. ha. 15d 1h 15m + 1,250.00
Certificate of Tide Gauge Benchmark (CTGB) station 5d 1h 15m 180.00
Digital Level Registration certification 1d 1,800.00
Evaluation of Geodetic Leveling Data benchmark 1d 500.00
Evaluation of GNSS Data pt. 1d 500.00
GNSS Receiver Registration receiver 1d 1,800.00
Map Certification and Evaluation (ENC, small-scale)
application certificate 19d 500.00
evaluation sq.cm. 0.20
certification certificate 200.00
DOCUMENTARY REQUIREMENTS
CHECKLIST OF REQUIREMENTS WHERE TO SECURE
External Client Request (ECR) form – (1 original) CSU
Proof of Payment (POP) – (3 photocopies/ digital copy) Land Bank of the Philippines (LBP)
Valid ID (SSS, GSIS, Voter’s ID, Passport, BIR, Driver’s License, Postal ID, UMID, PRC ID) – (1 original/digital copy) Concerned Government Agency
ADDITIONAL REQUIREMENT FOR CERTIFICATE FOR OFFSHORE ACTIVITY
Environmental Work Program for Offshore Exploration (EWPOE) received by MGB – (1 photocopy/digital copy) Client
ADDITIONAL REQUIREMENT FOR CERTIFICATION OF NO RECORD OF LC MAP AND/OR FAO
Request Letter Client
ADDITIONAL REQUIREMENTS FOR CERTIFICATION OF SLOPE MAP
Memorandum of Agreement (MOA) – (1 original/digital copy) PCRD, RDAB
Original/Transfer Certificate of Title (OCT/TCT) or Lot Data Computation/Lot Description or Survey/Sketch Plan – (1 blueprint/photocopy/digital copy) Client thru LRA/Registry of Deeds or DENR/LRA
Special Power of Attorney if the client is not the lot owner/claimant – (1 photocopy/digital copy) Client
Certified tie point from LMB/SMD – (1 original/digital copy) Client thru DENR
Survey/Sketch Plan – (1 blueprint/photocopy/digital copy) Client thru DENR/LRA
Special Power of Attorney if the client is not the lot owner/claimant – (1 photocopy/digital copy) Client
ADDITIONAL REQUIREMENT FOR LEVELING DATA EVALUATION
GNSS observation data in RINEX format Client
ADDITIONAL REQUIREMENT FOR CERTIFICATE FOR OFFSHORE ACTIVITY
Environmental Work Program for Offshore Exploration (EWPOE) received by MGB – (1 photocopy/digital copy) Client
RESPONSIBLE UNIT
PRODUCTS RESPONSIBLE UNIT CONTACT
Certification for Offshore Activity (COA) HB-CSU csu.hb@namria.gov.ph
8241-3494 to 98
loc. ---
Certification of Geodetic Control Points MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
Certification of Municipal Water Map and Technical Description MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
Certification of Nautical Distances (CND) HB-CSU csu.hb@namria.gov.ph
8241-3494 to 98
loc. ---
Certification of No Record of LC map and/or FAO RDAB-CSU csu.rdab@namria.gov.ph
8810-4831 to 34
loc. 750
Certification of Oceanographic Information (COI) HB-CSU csu.hb@namria.gov.ph
8241-3494 to 98
loc. ---
Certification of Slope Map RDAB-CSU csu.rdab@namria.gov.ph
8810-4831 to 34
loc. 750
Certification of Tide Gauge Benchmark (CTGB) HB-CSU csu.hb@namria.gov.ph
8241-3494 to 98
loc. ---
Digital Level Registration MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
Evaluation of GNSS Data MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
Evaluation of Geodetic Leveling D MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
GNSS Receiver Registration MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
Map Certification and Evaluation MGB-CSU csu.mgb@namria.gov.ph
8810-4831 to 34
loc. 612
PROCEDURE
  CLIENT STEP AGENCY ACTION FEE TIME RESPONSIBLE UNIT  
Inquire about certification, evaluation, or registration services Discuss product specification, service requirements, availability, processing time, payment options, price, and delivery mode None Processing time starts after client submits all requirements, if any, and CSU Staff accomplishes the ECR. CSS/CSU Staff
HB/MGB/RDAB
  Provide personal information Fill out the Client and Product Details in the NPASIS and generate ECR form.
  Identify the certification, evaluation, or registration services
  ON-SITE CLIENTS
(Clients who walk-in at the NAMRIA CSS/CSU/MSO)
01 Submit all required documents, if any, and acknowledge TOA Verify all required documents and issue ECR with Order of Payment (OP) None 20 min CSS/CSU Staff
HB/MGB/RDAB
 
02 Pay required fee Issue Official Receipt (OR) See Fee above 15 min Cashier
Administrative Division
03 Present OR Verify and record OR None 15 min CSS/CSU Staff
HB/MGB/RDAB
    Prepare certification, evaluation, or registration service document None See PT above Processing Unit
HB/MGB/RDAB
04 Submit ECR copy with acceptance of the service document Release certification, evaluation, or registration service document, and issue CS form None 20 min CSS/CSU Staff
HB/MGB/RDAB
  TOTAL PROCESSING TIME: 1 hour, 10 min + PT
  OFF-SITE CLIENTS
(Clients who lodge requests through email, phone, or social media)
01 Submit all required documents Verify all required documents and send ECR with OP None 20 min CSS/CSU Staff
HB/MGB/RDAB
 
02 Pay required fee (Off-site payment) Wait for Proof of Payment (POP) See Fee above Client Driven (CD) CSS/CSU Staff
HB/MGB/RDAB
 
03 Send digital POP Verify POP and issue OR None 1 day Cashier
Administrative Division
    Record OR None 5 min Processing Unit
HB/MGB/RDAB
    Prepare certification, evaluation, or registration service document None See PT ablove
04 Submit ECR copy with acceptance of the service document Release certification, evaluation, or registration service document and send CS form None 15 min CSS/CSU Staff
HB/MGB/RDAB
  TOTAL PROCESSING TIME: 1 day, 40 min + PT
  Accomplish CS form Accept and verify CS form None Optional CSS/CSU Staff
HB/MGB/RDAB
  Accomplish Product Evaluation (PE) form Accept and verify PE form None For returning clients CSS/CSU Staff
HB/MGB/RDAB
Building a geospatially-empowered Philippines
© National Mapping and Resource Information Authority 2021
Top Page